A 27 m production line in a large logistics center
Challenge
Insufficient airflow at the far end
Challenge
Inefficient equipment additions
Challenge
Heat exposure for rear-line workers
See the solution
→
No items found.
Baemin B Mart Logistics Center
Lower costs through packing-zone spot cooling in an approximately 990 m² facility
Challenge
Rising costs of whole-space heating and cooling
Challenge
Poor comfort in the work zone
Challenge
Limited reach of existing air conditioners
See the solution
→
No items found.
ABC Mart Logistics Center
Case study: Spot cooling in a large, high-ceiling logistics center that reduces the number of air conditioners needed by focusing cold air only on work zones.